高压变电站1(1/2)主接线系统抗震可靠性分析  被引量:9

Seismic reliability analysis of breaker-and-a-half configuration of high voltage substations

在线阅读下载全文

作  者:李天[1] 李杰[1] 沈祖炎[1] 

机构地区:[1]同济大学建筑工程系,上海200092

出  处:《世界地震工程》2000年第3期58-62,共5页World Earthquake Engineering

摘  要:讨论了高压变电站1(1/2)电气主接线系统的抗震可靠性计算方法。针对这种接线形式的特 点,提出应当按网络系统计算系统的可靠性,并提出了3种可靠性分析准则,以计算系统的可靠性。实例分析表明,具有1(1/2)电气主接线系统的变电站,虽然各个电气设备的抗震可靠性不是很高,但 其主接线系统的抗震可靠性可以比单个设备的可靠性高得多。This paper discusses the analysis of seismic reliability of breaker-and-a-half configuration of high voltage substation. According to the characteristic of this kind of configuration, three kinds of conditions to analyze the reliability of electrical network of substation are given. The results of case studied show that the seismic reliability of break- er-and-a-half configuration is very high, though the reliability of each electrical equipment is not very high.

关 键 词:电气主接线 高压变电站 抗震可靠性 网络系统 

分 类 号:P315.9[天文地球—地震学] TM645[天文地球—固体地球物理学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象