检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:SONG ZhanFeng XIA ChangLiang LIU Tao DONG Nan
机构地区:[1]School of Electrical Engineering and Automation,Tianjin University [2]Tianjin Key Laboratory of Advanced Technology of Electrical Engineering and Energy,Tianjin Polytechnic University [3]Beijing Electric Power Company
出 处:《Science China(Technological Sciences)》2013年第4期1017-1028,共12页中国科学(技术科学英文版)
基 金:supported in part by the National Key Basic Research Program of China ("973" Program) (Grant No. 2013CB035602);the National Natural Science Foundation of China (Grant No. 51107084);the Doctoral Program of Higher Education of China(Grant No. 20100032120081)
摘 要:Due to the excellent dynamic performance,the Finite Control Set Model Predictive Control has been widely used in various types of converters.However,when Finite Control Set Model Predictive Control is adopted,the switching frequency of converters varies significantly with system operating conditions.Consequently,constant-frequency predictive control strategy has been proposed.Two active voltage vectors and a zero voltage vector are selected within each sampling period.The action time sequence is then calculated.Due to the unsymmetrical distribution of current variation rates around zero,the calculated value of the voltage-vector action time will turn up negative.According to common sense,the voltage-vector action time is greater than or equal to zero.The action time is normally forced to zero whenever a negative value is predicted,resulting in the control failure and performance deterioration.To solve this problem,this paper proposes modified strategy.The modified strategy examines the action time calculated out.When negative action time comes out,the modified strategy reselects the active voltage vector accordingly,instead of forcing the action time to be zero.Optimized action time sequence is further determined by minimizing the cost function.The effectiveness of the modified strategy is clearly verified by experimental tests,and analytical remarks are all founded in practical results.
关 键 词:CONVERTER cost function optimized action time sequence negative action time
分 类 号:TM76[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38