检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南阳理工学院土木工程学院,河南南阳473004 [2]南阳工程咨询中心,河南南阳473000
出 处:《南阳理工学院学报》2012年第4期77-79,107,共4页Journal of Nanyang Institute of Technology
基 金:河南省基础与前沿技术研究计划项目(102300410148)
摘 要:本文通过对某地铁车站深基坑工程两种降水方案进行数值模拟,分析了一次性降水和分步降水条件下基坑的变形规律。通过数值分析得到,一次性降水引起的基坑变形明显大于分步降水引起的基坑变形,在施工工期许可的情况下,尽量采用分步降水的方案,以便减少基坑开挖引起的变形。In this paper, a deep foundation pit of one subway station is analyzed under two different precipitation conditions, and the deformation laws of the pit under one - time precipitation and step - by - step precipitation conditions are investigated. The results indi- cate that the deformations caused by one - time precipitation are significantly larger than the deformations caused by step - by - step precipitation. Therefore, a step - by - step precipitation scheme is preferred in order to reduce the deformation cause by foundation ex- cavation, when construction period permits.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249