检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:摆世彬[1]
机构地区:[1]宁夏电力公司电力调度控制中心,宁夏银川750001
出 处:《宁夏电力》2013年第1期14-17,24,共5页Ningxia Electric Power
摘 要:电力系统分析综合程序(Power System Analysis Synthesis Program,PSASP)对变电站母线拓扑结构做了简化,潮流计算中不能反映变电站内部各引流线及CT潮流变化。通过分析PSASP程序和3/2接线方式的特点,提出了增加母线节点法和断面定义法两种解决方案,并通过实际案例进行了验证。应用结果表明:两种方案均能够有效解决3/2接线中CT过载无法观测的问题。Power System Analysis Synthesis Program (PSASP) simplifys bus bar topological struc- ture of substation, power flow calculation can' t reflect each conduction line and CT power flow varia- tion inside substation. Through analyzing PSASP and the characteristic of 3/2 connection mode, puts forward 2 solution schemes: to add node of bus bar and section definition method, and through practi- cal example makes verification. The result shows that two kinds of schemes all can effectively solve the problems of CT overload can' t be observed in 3/2 connection.
关 键 词:PSASP 3 2接线 潮流计算 边开关 CT过载
分 类 号:TM711[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229