基于PSASP的潮流计算中3/2接线方式相关问题探讨  

Treatment methods of CT overload problems of 3/2 connection mode in power flow calculation based on PSASP

在线阅读下载全文

作  者:摆世彬[1] 

机构地区:[1]宁夏电力公司电力调度控制中心,宁夏银川750001

出  处:《宁夏电力》2013年第1期14-17,24,共5页Ningxia Electric Power

摘  要:电力系统分析综合程序(Power System Analysis Synthesis Program,PSASP)对变电站母线拓扑结构做了简化,潮流计算中不能反映变电站内部各引流线及CT潮流变化。通过分析PSASP程序和3/2接线方式的特点,提出了增加母线节点法和断面定义法两种解决方案,并通过实际案例进行了验证。应用结果表明:两种方案均能够有效解决3/2接线中CT过载无法观测的问题。Power System Analysis Synthesis Program (PSASP) simplifys bus bar topological struc- ture of substation, power flow calculation can' t reflect each conduction line and CT power flow varia- tion inside substation. Through analyzing PSASP and the characteristic of 3/2 connection mode, puts forward 2 solution schemes: to add node of bus bar and section definition method, and through practi- cal example makes verification. The result shows that two kinds of schemes all can effectively solve the problems of CT overload can' t be observed in 3/2 connection.

关 键 词:PSASP 3 2接线 潮流计算 边开关 CT过载 

分 类 号:TM711[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象