检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐麟[1] 吴正义[1] 单鹏珠[1] 阎应飞[1]
机构地区:[1]国网电力科学研究院/南京南瑞集团公司,江苏省南京市210003
出 处:《水电自动化与大坝监测》2012年第5期10-13,共4页HYDROPOWER AUTOMATION AND DAM MONITORING
摘 要:以梯级水电站计算期末蓄水能最大为目标,考虑了站间联合躲避各机组振动区等约束条件,确定了机组开停机与站间负荷优化分配模型协调统一的梯级水电站经济运行算法,提高了梯级水电站实时控制的安全性、经济性和实时性。根据上述研究成果,基于智能水电厂统一平台开发梯级水电站经济调度控制软件一套,并在松江河智能水电厂改造项目中推广应用。To achieve the target of maximum energy reservation of cascade hydropower stations in the end of the calculation period,and in consideration of the constraints such as the joint vibration,an economic operation algorithm of cascade hydropower stations is determined,in which the starting-stopping of hydropower units and load distribution between hydropower stations are coordinated,improving the security,economy and real-time performance of real-time control of cascade hydropower stations.An economic dispatching control(EDC) software set of cascade hydropower stations based on the above algorithm and a universal platform for intelligent hydropower plant has been developed and successfully applied to the Songjianghe intelligent hydropower plant project.
关 键 词:智能水电厂 梯级水电站 统一平台 经济调度控制(EDC)
分 类 号:TV74[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229