国际工程合同索赔与变更优化  被引量:1

International Engineering Construction Claims and Design Variation Optimization

在线阅读下载全文

作  者:吕奎[1] 汪小康[2] 吕锋 

机构地区:[1]中国地质大学工程学院,湖北武汉430074 [2]中南财经政法大学经济学院,湖北武汉430060 [3]中国土木工程集团有限公司.北京100038

出  处:《建筑经济》2013年第4期38-41,共4页Construction Economy

摘  要:通过分析尼日利亚阿卡铁路项目实际发生的两起合同验工条款索赔和两个优化设计变更的成功案例,总结合同索赔和设计变更的过程和取得的成果,分析总价合同和单价合同采用不同的处理方式,阐述合同索赔和设计变更时与咨询工程师或业主谈判的技巧,最后提出索赔和变更取得成功的重要条件,即紧抓合同,实现互利共赢。Based on the successful cases-two claims for the contract clauses of the measurement of work executed and two design variations optimization actually occurred in the summarizes the process and aceomplishments of contract claims Nige and rian Railway Modernization Project, this paper design variations, analyzes the different treat- ments adopted for both lump-sum contract and unit price contract; states the negotiation skills for the project's era- ployer or the consultant regarding to the contract claims anti design variations. At last, the important conditions of the success for the claims and variations are put forward -basing on the contract tight to occupy the commanding point of the theory, following the strategy of mutual benefit and win-win results to create better benefit for the project.

关 键 词:国际工程 合同索赔 变更优化 

分 类 号:F407.9[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象