科威特中央银行新总部大楼清水实心砌体施工技术  

Construction of Exposed Solid Block Wall in the New Headquarters Office Building of Central Bank of Kuwait

在线阅读下载全文

作  者:曲新钢 王力尚 吴慎金 纪涛 

机构地区:[1]中建中东有限责任公司

出  处:《施工技术》2013年第6期115-117,共3页Construction Technology

基  金:中建股份科研项目资助(CSCEC-2011-C-04)

摘  要:科威特中央银行新总部大楼高约239m,由主楼、裙楼和人防工程组成。部分区域采用清水砖墙作为围护结构。详细介绍了清水砖墙的施工过程及质量控制措施,包括砂浆的配合比设计、灰缝的饱满度以及节点设计。同时,清水砌体砌筑过程中还涉及与其他专业协调工作。通过加强施工过程管理,保证了清水砌体的顺利施工。The new headquarters office building for Central Bank of Kuwait is about 239m high,consisting of office tower,podium and shelter.Part of the building uses fair-faced brick wall as the enclosure structure.This paper introduces in detail the construction procedure and quality control measures for the fair-faced brick wall including mix proportion design of mortar,richness of mortar seam and joint design.Wall construction involves coordination with other disciplines.By strengthening construction process management,the construction of the fair-faced brick wall is completed successfully.

关 键 词:高层建筑 清水砌体 配合比 施工技术 

分 类 号:TU754.1[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象