检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]四川大学水力学与山区河流开发保护国家重点试验室,成都610065
出 处:《西南民族大学学报(自然科学版)》2013年第2期233-236,共4页Journal of Southwest Minzu University(Natural Science Edition)
摘 要:某低水头电站因工程需要采用的缓坡溢洪道挑流消能效果不理想,对右岸岸坡和河床冲刷较为严重.试验研究了两种挑坎体型下出坎水舌形态、落水点及对下游河床的冲刷,推荐采用的差动坎方案能使水流纵向扩散更充分,减轻水流对下游的冲刷,消能效果显著.论文对该类工程泄洪消能设施布置原则进行了总结,对类似工程有借鉴意义.The energy dissipation of ski-jump type is adopted in a hydropower station, but the effect of energy dissipation is not good because of the low water head and gentle slop of spillway. Meanwhile, the right bank and the riverbed are scoured seriously. The shape ofnappe, the position of splash and the scouring of the bed are experimented. It shows that slotted flip bucket is advanced in longitudinal diffusion flow, scour of bed and effect of energy dissipation. The paper summarizes the principle of energy dissipation facilities layout, which has guiding significance for similar projects.
分 类 号:TV131.4[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31