CEFR事故余热排放系统优化设计  被引量:1

Optimization design of emergency decay heat removal system for CEFR

在线阅读下载全文

作  者:唐龙[1] 齐敏[1] 余华金[1] 刘佳[1] 

机构地区:[1]中国原子能科学研究院,北京102413

出  处:《核技术》2013年第4期292-296,共5页Nuclear Techniques

摘  要:为提高快堆管道设计的经济性,根据支吊架优化原则,对事故余热排放系统进行优化设计,使管道系统在各种预期的载荷工况下,都能满足ASME设计规范规定的应力限值,并减少阻尼器、弹簧支吊架的使用量。通过对CEFR的事故余热排放系统的优化设计,积累了高温管道支吊架的布置经验,为以后快堆的管道设计打下基础。Background: China experimental fast reactor (CEFR) is the first fast reactor in China, the piping designs are very important for the fast reactor. Purpose: The purpose is to improve the economy of pipeline design for the fast reactor. Methods: According to the optimization principles, redesign the support system of emergency decay heat removal system. Results: The piping of emergency decay heat removal system meets the ASME standard stress limit value under various prospective loads, and reduces the number of dampers, spring hangers. Conclusions: We accumulate layout experience for the support design of high temperature piping by the optimization design for emergency decay heat removal system, lay the foundation for the fast reactor piping design in the future.

关 键 词:事故余热排放系统 支吊架 ASME 高温管道 

分 类 号:TL375.5[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象