检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]兖州煤业股份有限公司济宁三号煤矿,山东省济宁市272169 [2]中国矿业大学矿业工程学院,江苏省徐州市221116
出 处:《中国煤炭》2013年第4期56-59,108,共5页China Coal
摘 要:为避免因工作面搬家所带来的工期延长及经济损失,并且考虑到煤层顶底板岩性较好,济宁三号煤矿53下07(北)综放工作面决定采用割顶留底的方法直接过断层。根据断层区域顶板活动数值模拟结果和工程地质情况,分析和设计了53下07(北)综放工作面直接过断层技术措施。实践证明该技术方法有效保证了工作面安全快速通过断层区域,相比重新开切眼工作面搬家方案,该方案少掘了一条巷道,同时减少了断层保护煤柱的留设,提高了煤炭资源的回收率。To avoid construction time extension and financial loss caused by face movement, and in view of good rock characters of seam roof and floor, the method of cutting roof and retai-ning floor was used in 53(lower) 07(north) fully-mechanized caving face to pass through the fault directly in Jining No. 3 Coal Mine. The paper analyzed and designed the technical measure based on the numerical simulation results of roof activities in fault area and the geological conditions. Practice shows that the technical scheme has ensured the working face passing through the fault area safely and quickly. Comparing the method of reopening a cut for face movement, this scheme avoids another drivage and reduces the fault protective pillar, which helps to improve the coal recovery rate.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.40.152