检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王福运[1] 冯吉新[1] 王富强[1] 匡啟兵[1]
机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《东北水利水电》2013年第4期1-2,5,共3页Water Resources & Hydropower of Northeast China
摘 要:蒲石河抽水蓄能电站工程下水库大坝为混凝土坝,由7孔排沙闸、挡水坝段组成。施工洪水具有典型东北山区河流陡涨陡落的特点,多集中在7,8月份。下水库大坝施工导流采用分期导流方式,一期主河床过流,二期采用过水围堰挡水、坝体导流底孔过流。文章介绍了蒲石河抽水蓄能电站工程下水库施工导流设计,结合施工工期的选择,简要论述了导流标准、导流方式以及导流建筑物布置情况。The lower reservoir dam of Pushihe pumped storage power station is the concrete dam,which is composed by the 7 holes desilting gates and retaining dam section.The construction flood mostly concentrated in July and August,has the typical features of peak with rising and dropping steeply in northeast mountain rivers.The stage diversion mode is adopted for the construction of lower reservoir dam,main riverbed sluicing in the first-phase construction and overflow cofferdam retaining water and dam diversion bottom outlet drainage in the second-phase construction.The paper introduces the diversion design of the lower reservoir construction for the Pushihe pumped storage power station,briefly discusses the diversion standards,the diversion mode and the arrangement of the diversion structures combinning with the choice of the construction period.
分 类 号:TV551[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.4