检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]松辽水利委员会水文局,吉林长春130021 [2]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《东北水利水电》2013年第4期41-42,46,共3页Water Resources & Hydropower of Northeast China
摘 要:白山、红石、丰满是第二松花江上游的3座大、中型梯级水电站。红石水库迄今为止没有编制过调度方案,白山、丰满水库的洪水调度方案不同时期已经编制多次,2010年大洪水发生后,使得编制红石水库调度方案显得尤为重要。文章对二松流域白山、红石、丰满设计洪水进行复核后,按照白丰联调方案的原则,进行了红石水库调度方案研究,确定了红石水库调度方案,并对典型年洪水在新的调度方案下进行了分析。The Baishan,Hongshi and Fengman hydropower stations are the three large and medium-sized cascade hydropower stations,which is located in the upper reaches of the second Songhuajiang River.The flood dispatching scheme of Hongshi reservoir has not been compiled so far,and the flood dispatching scheme of the Baishan and Fengman reservoirs have been complied many times in the different period.Then the dispatching scheme compiling of Hongshi reservoir is becoming particularly important after the big flood in 2010.The paper checks the design flood of the Baishan,Hongshi and Fengman reservoirs in the second Songhuajiang Basin,studies and determines the dispatching scheme of Hongshi reservoir based on the principle of the Baishan and Fengman united dispatching scheme,analyzes the typical year flood under the condition of the new dispatching scheme.
分 类 号:TV697.11[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.31.133