检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:欧义明
机构地区:[1]浙江省电力建设有限公司,浙江宁波315010
出 处:《工程建设与设计》2013年第4期137-139,共3页Construction & Design for Engineering
摘 要:在黄淮流域地区,PHC管桩施工时,容易遇到土层密实桩身下部断桩的情况。究其原因,由于土体具有黏、干、硬的特点,桩内土芯不易上升,在锤击沉桩过程中桩内土芯不断地挤密,最终形成土塞效应,桩内土芯压应力无法释放挤压破坏桩壁,造成桩身在锤击的反复作用下发生断裂。在上述地层条件下,PHC管桩沉桩时采用桩尖加内环等措施,可有效降低桩内土体的挤压力,解决桩身严重破损的难题。In Huang Huai River Basin PHC pipe pile hammer construction,the pile often be damaged in pile bottom when penetrating the hard layero Investigate its reason, because the soil has the stick, dry, hard characteristics, pile soil core is not easy to rise, in the pile driving pile in the process of soil core continuously compaction, culminating in the formation of soil plug effect, pile soil core compressive stress released crushing pile wall, resulting in the pile hammer repeated for fracture. Considering above stratum conditions, adopting pile toe ring, will efficiently minimize the extrusion stress in the pile, and solve the problem of sever damage on the pile.
关 键 词:桩基础 PHC管桩 桩身断裂 土塞效应 桩尖内环
分 类 号:TU753.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:13.59.205.74