检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:焦冬梅[1] 余志兵[1] 杜永军[1] 韩旭[1]
出 处:《石油工程建设》2013年第2期4-7,7,共4页Petroleum Engineering Construction
摘 要:在海底管道安装期,对裸置于海床上的管道,在波流等自然环境因素的作用和影响下,当依靠其自身重量不足以保持稳定时,充水铺设是解决问题的方法之一。文章主要从海底管道的稳定性、铺设可行性以及施工工艺三个方面对充水铺设方法进行了详细阐述,总结了此方法的优点和不足,并以渤海湾某海底管道为例,说明了此种方法的具体应用。When a submarine pipeline can not maintain its stability if only relying on its own weight in the installation period under the action and influence of wave,current and other natural environmental factors,one of the methods to solve the problem is to fill water into the pipeline.This paper explains the method in detail from three aspects: pipeline stability,laying feasibility and construction technology,and summarizes the advantage and disadvantage of this method.Taking one submarine pipeline in Bohai Bay for example,it illustrates the specific application of this method.
分 类 号:TE973[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117