机构地区:[1]兰新铁路新疆有限公司,乌鲁木齐830011 [2]兰州交通大学土木工程学院,兰州730070
出 处:《路基工程》2013年第2期65-68,共4页Subgrade Engineering
基 金:铁道部科技研究开发计划(2009G020-C)
摘 要:兰新铁路第二双线穿越新疆戈壁地区著名的四大风区,为防止路基边坡遭受戈壁风沙流吹蚀以及雨水冲蚀破坏,在线路所经戈壁地区设立三处路基边坡试验工点,选用了七种边坡防护措施,分别从防护效果、技术经济等角度对试验段各种边坡防护措施进行研究。研究结果表明:全线路堤边坡防护中,若边坡高度H<3 m时,边坡坡面宜采用混凝土空心砖防护;边坡高度H≥3 m时,边坡坡面宜采用拱形骨架护坡,骨架内铺设混凝土空心砖进行防护。The Second Double Line of Lanzhou-Xinjiang Railway crosses the well-known four wind areas in Gobi region, Xinjiang. To prevent subgrade slope from erosion caused by wind-sand flow and rain water there, there are three test points on the slope along the line are set with seven varieties of slope protection measures used and, from the perspective of protection result, technology and economics, these measures are studied.The result shows that with regard to the protection along the whole line, the slope surface shall be protected appropriately by, in case of the slope height less than 3m, hollow concrete brick, and in case of the slope height more than or equal to 3m, arch skeleton, i.e. laying hollow concrete brick in the skeleton.
分 类 号:U416.14[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.45.133