检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李杏[1] 孙春顺[1] 陈浩[1] 李昱[1] 葛宇轩[1]
机构地区:[1]长沙理工大学电气与信息工程学院,长沙410004
出 处:《电气技术》2013年第4期29-32,共4页Electrical Engineering
基 金:湖南省教育厅科学研究项目(10A015)
摘 要:针对风速预测精度影响水风电联合运行的优化结果,本文将在随机变量表示风电场的输出功率的基础上,建立了一种基于随机规划的水风电联合优化运行数学模型。模型以总发电量和水电厂蓄水量增量之和最大为目标,结合随机模拟技术粒子群算法求得此目标函数的全局最优值。最后,对该模型采用Matlab编程求解,仿真结果验证了文中所提方法的可行性。For the optimal result of hydro-wind integrated operation is often affected by the prediction accuracy, an optimized hydro-wind integrated operation model based on stochastic programming is proposed in this paper by introducing a random variable as the output power of wind farm. The model is aimed at obtaining the maximum increment of the total generated electricity and the water storage of hydro-plants. The global optimum is calculated by stochastic simulation of particle swarm algorithm. At last, MATLAB software is used to program and get the simulation result, and the result shows that the method proposed in this work is feasible.
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15