检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河勘测规划设计有限公司,河南郑州450003
出 处:《水电能源科学》2013年第4期100-102,33,共4页Water Resources and Power
摘 要:设计人工湖时,若湖体形态设计不科学或为维持湖体水环境质量而进行换水的次数不合理,将造成水资源的极大浪费。采用EFDC模拟软件对石家庄市正定湖6种设计方案条件下的湖泊流场进行了模拟计算,在不同调水方案下对正定湖水龄和颗粒物进行追踪模拟,预测了正定湖水质变化规律。结果表明,调水流量为50m3/s时既能大幅度改善正定湖水环境质量,又能减少调水时间和节约水量,此时调水时间3~4d方案为最优设计方案。During the design of artificial lake, unscientific lake shape design or unreasonable frequency of water change for maintaining water environment quality of lake will cause a great waste of water resources. EFDC software is used to simulate the flow field of Zhengding Lake, Shijiazhuang under 6 design schemes. Through simulation of water age and tracking of particle under different water transfer plan, the variation rules of water quality is predicted. The results show that when the flow is about 50m^3/s, the time and water resource needed is the most economic and the water environment quality of Zhengding Lake is also improved greatly~ the time of water transfer is 3-4 days for optimization design scheme.
分 类 号:TV214[水利工程—水文学及水资源] X824[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117

