大连国际会议中心悬挑桁架安装施工技术  被引量:1

CONSTRUCTION TECHNIQUE FOR INSTALLATION OF SUSPENSION TRUSS OF DALIAN INTERNATIONAL CONFERENCE CENTER

在线阅读下载全文

作  者:周光毅[1] 毛立贤[1] 唐家如[1] 陈超[1] 刘旭[1] 

机构地区:[1]中国建筑第八工程局有限公司大连分公司,辽宁大连116021

出  处:《建筑技术》2013年第4期308-311,共4页Architecture Technology

摘  要:大连国际会议中心悬挑桁架安装施工过程中,为降低临时支撑反力、减小支撑拆除时的卸载吨位,同时避免周边悬挑桁架上组合楼板混凝土在支撑拆除时由于桁架下挠变形而开裂,采取组合楼板及建筑构造面层在支撑拆除后进行施工的方案。在平台桁架吊装、结构合龙、现场质量控制及支撑拆除等方面采取了相应的技术措施,满足了施工质量要求。During installation of suspension truss in Dalian International Conference Center project, composite floor and structural layers of building are construction after support structures are dismantled, with the purposes to reduce counterforce of temporary support and unloading tonnage in dismantlement of support and to avoid crack caused on concrete of composite floor on surrounding suspension truss due to down-warping deformation of truss. Relevant technic, al measures quality control and dismantlement of support, and are adopted for lifting of platform truss, structure closure, fieht construction quality requirements are successfully satisfied.

关 键 词:桁架 安装 悬挑 合龙 支撑拆除 

分 类 号:TU758[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象