检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周光毅[1] 白羽[1] 肖应乐[1] 唐家如[1] 毛立贤[1]
机构地区:[1]中国建筑第八工程局有限公司大连分公司,辽宁大连116021
出 处:《建筑技术》2013年第4期346-349,共4页Architecture Technology
摘 要:营口奥林匹克中心体育场工程在大直径预应力拉索安装及张拉施工过程中,应用拉索"滑移法"安装、细线导向安装、拉索分步分级张拉等技术创新和工艺改进,解决了大直径预应力拉索安装及张拉施工难题,确保了施工质量和进度,大大降低了工程建造成本,取得了良好的经济效益和社会效益。During installation and tensioning of large-diameter prestressed cable in Yingkou Olympic Center Stadium project, technical innovations and process improvements, such as cable installation by using "sliding method", guiding installation of fine cable and cable tensioning in steps and levels, etc., are applied to successfully solve the difficuhies in installation and tensioning construction of large-diameter prestressed cable. Construction quality and schedule are ensured, construction cost reduced obviously and favorable economic and social benefits obtained.
关 键 词:大直径 预应力索 滑移法牵引 细线引导 分步分级张拉 计算机仿真 复杂工况
分 类 号:TU758[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28