检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄小兰[1]
机构地区:[1]中铁一局集团第五工程有限公司,宝鸡721006
出 处:《价值工程》2013年第12期106-107,共2页Value Engineering
摘 要:本文通过对浏阳河隧道出口段衬砌底板下设置抗拔桩抗浮的施工案例,根据实际施工经验提出灌注前准备、灌注过程中的合理有效的控制手段,探讨在不良地质地段的开挖、砼浇注过程采取必要的施工措施,从而保证桩身砼质量。文章最后,还对检测方法、结果评定等方面也做了相关介绍,为基桩施工积累了宝贵的施工经验。In this paper, through the construction case of arranging uplift pile under lining plate in Lluyang river tunnel segment, naseu on the practical construction experience, preparation before perfusion, rational and effective control means of process of perfusion was put forward, and necessary construction measures adopted in process of excavation and concrete pouring in bad geological sections were discussed, so as to ensure the quality of pile shaft concrete. Finally, the detection method, and evaluation of results were also introduced, accumulating valuable construction experience for pile foundation construction.
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.190.152.109