煤矿提升机电气控制系统的技术改造  被引量:13

Coal Mine Hoister Electrical Control System of Technical Transformation

在线阅读下载全文

作  者:黄炳义[1] 孟红秀[1] 李立君[1] 

机构地区:[1]邢台职业技术学院,河北邢台054035

出  处:《煤矿机械》2013年第5期198-199,共2页Coal Mine Machinery

摘  要:概述了PLC技术的应用,明确了煤矿提升机电气控制系统的主要构成,并着眼于现行煤矿提升机电控系统存在的诸多问题,就基于PLC技术应用的煤矿提升机电控系统改造作出分析论述,意在为PLC技术在煤矿提升机电控系统中的实践应用提供借鉴与支持,促进煤矿提升机电控系统自动化水平的进一步提升。This paper summarizes the application of PLC technology, has been clear about the coal mine hoister gas control system of the main composition, and focus on the current coal mine hoister control system, there are many problems to based on PLC technology application of coal mine hoister control system reform to make analysis, this article is intended to PLC technology in coal mine mechanical and electrical control system improve the practice of application with reference and support, to promote coal mine hoister control system automation level of further ascension.

关 键 词:煤矿提升机 电气控制系统 PLC 技术改造 

分 类 号:TD534[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象