检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河北省电力勘测设计研究院,河北石家庄050031 [2]中国水电工程顾问集团公司,北京100120
出 处:《水力发电》2013年第5期80-83,共4页Water Power
摘 要:在大规模风电场工程规划设计中,如何优化电气系统设计方案,为风电场项目的科学决策提供依据,是风电场总体规划设计所面临的问题。运用全寿命周期成本管理的方法,对大规模风电场的总体规划设计进行了优化。通过综合技术经济比较,验证了总体规划设计方案初投资额的大小并不能代表其经济上的优劣,只有项目全寿命周期成本最低的方案,才是最为经济的方案。How to optimize electrical system design of large-scaled wind farms, which is able to provide basis for making a scientific decision of wind farm projects, is a main problem in the overall planning and design of wind farms. The life cycle cost management is used herein to improve the planning and design of large-scaled wind farms. Comprehensive technica/ and economic comparison shows that the amount of investment in overall planning and design program cannot explain project's advantage in economy, and the program with lowest life cycle cost is the most economic solution.
分 类 号:TU201[建筑科学—建筑设计及理论] TU712
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15