检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:廖建忠[1]
机构地区:[1]新疆水利水电勘测设计研究院,乌鲁木齐830091
出 处:《西北水电》2013年第2期11-14,共4页Northwest Hydropower
摘 要:针对水库诱发地震危险性评价,国标GB21075-2007《水库诱发地震危险性评价》要求分别采取定性评价、概率评价和综合评价3种方法进行评价。但目前特别在中小型水利水电工程的水库诱发地震评价中,仍普遍采用类比法进行定性评价,定量和半定量的评价方法很少用。概率评价是一种半定量评价法,概率评价的方法较多,但因常牵涉到高深的数学理论知识,广泛应用有一定的难度。笔者认为诱震八因子概率统计模型法在水库诱发地震危险性概率评价中,具有求解简单、可操作性强的特点,特别适合进行水库诱发地震危险性的半定量评价。regarding risk assessment on the earthquakes induced by reservoir, three methods are required in Risk Assessment on Earth- quake Induced by Reservoir (GB21075-2007) : qualitative assessment, probability assessment and comprehensive assessment. Currently, the qualitative assessment by application of analogy method is widely applied especially in assessment of earthquakes induced by reservoirs of small & medium-sided water resources and hydropower projects. Both the qualitative and the semi-qualitative assessment methods are seldom applied. The probability assessment method is a semi-qualitative assessment one. It is with a couple of methods. But, it is diffi- cult to apply widely as it often involves advanced mathematic theory. Therefore, in the probability assessment of risks of earthquakes in- duced by reservoirs, the probability statistics model for the eight factors of induced earthquakes features simple explanation and strongly practical operation, and especially it is suitable for the semi-qualitative assessment of risks of the earthquakes induced by reservoirs.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.219