薛家坪提黄工程优化设计研究  

Optimization Design and Research of Xuejiaping Yellow River Lifting Project for Irrigation

在线阅读下载全文

作  者:董亮[1] 黄伟[1] 

机构地区:[1]太原理工大学水利科学与工程学院,山西太原030024

出  处:《人民黄河》2013年第4期55-57,共3页Yellow River

摘  要:针对薛家坪提黄工程的实际情况,对取水方式、水泵选型、运行方式等进行了比选,提出了优化设计方案:针对泥沙较多的取水问题,采用沉沙池技术;在水泵选型时多尺度考虑上下级泵站流量匹配、机组备用、灌溉与工业用水结合等问题;运行方式采用单管运行,并配合蓄水池方案。该优化设计方案符合工程实际,节省了投资。According to the situation of Xuejiaping Yellow River lifting project for irrigation and the research of pump selection ,water supply method and operational mode,this paper proposed an optimization design: build a dcsilting basin to solve the problem of high sediment concentration; for the pump selection, consider the aspect of pump station flow matching between upper and lower levels, the unit spare, irrigation and industrial combina- tion; take the design of single pipeline combined with reservoir for operational mode. The optimized design accords with the actual project and saves investment.

关 键 词:供水工程 水泵选型 优化设计 运行方式 薛家坪提黄工程 

分 类 号:S275[农业科学—农业水土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象