检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邢振贤[1] 牛克纳[1] 王雅楠[1] 谢琰[1]
出 处:《混凝土》2013年第4期98-100,共3页Concrete
基 金:水利部堤防安全与病害防治工程技术研究中心开放课题基金项目(2009-02);黄河水利委员会黄河水利科学研究院专项课题项目(HKY-JBYW-2012-13)
摘 要:无砂大孔混凝土生态护坡现场施工流程,包括场地开挖、框格预制构件铺设、混凝土浇筑、营养土填充、植物栽种、后期管护与监测。试验表明:无砂大孔混凝土生态护坡,成本低,工序简便,工程效果好;预制混凝土六角砖护坡,抗冲稳定性好,固土能力强,适合作陡坡护岸材料;预制混凝土矩形框格护坡,尺度大,施工效率高,便于推广应用;建议选择施工区当地乡土植物作为植被绿化材料。The scene construction process of large cavity concrete without sand ecological slope protection includes excavating the site, laying the prefabricated concrete component,pouring concrete, filling nutritive soil, planting vegetation, final-period management and observation.It showed that large cavity concrete without sand ecological slope protection had low cost, simple process and good effect.The revetment of precast concrete hexagonal tile was suitable for excellent resistance to water wash out and good capability of fixing soil, slope protection ofprecast concrete rectangular frame was easy to popularize and be used for its large scale and high efficiency of construction.It suggested that select native plants for greening materials.
分 类 号:TU528.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.82.202