检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海城建市政工程(集团)有限公司,上海200065 [2]同济大学土木工程学院,上海200092 [3]同济大学道路与交通教育部重点实验室,上海201804
出 处:《城市道桥与防洪》2013年第4期125-127,14,共3页Urban Roads Bridges & Flood Control
摘 要:该文针对长江口细砂路基压实的技术难点,以室内击实试验为基础,结合现场施工实际,综合考虑细砂填料"多峰"特性、细砂最佳含水率和天然含水率关系、现场施工便易性等因素,明确了长江口细砂路基填筑施工含水率的确定方法。Aiming at the technical difficulties of roadbed compaction by the fine sand at the mouth of Changjiang River,based on the indoor compaction test and according to the field construction practices,the article comprehensively considers the 'multi-peak' characteristic of fine sand stuffing,the relationship of the best water content and the natural water content of fine sand,the usability of field construction and the other factors,and makes clear the method for determining the water content in the filling construction of roadbed by the fine sand at the mouth of Changjiang River.
分 类 号:TU521.1[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200