混和梁斜拉桥中跨加载合龙施工技术  被引量:4

Construction Technology for Closure of Mid-span Girders of a Hybrid Girder Cable-stayed Bridge

在线阅读下载全文

作  者:卢勇 杨培诚 

机构地区:[1]中交第二航务工程局第五工程分公司,湖北武汉430012 [2]浙江温州沈海高速公路有限公司,浙江温州325038

出  处:《中国港湾建设》2013年第2期60-64,共5页China Harbour Engineering

摘  要:主跨926 m的鄂东长江公路大桥是一座边跨为混凝土梁,中跨为钢箱梁的混合主梁斜拉桥。根据该桥的结构特点,分析合龙条件、不同合龙方案对成桥线形和应力的影响,最终确定采取加载合龙的施工技术。文中介绍了加载合龙的具体流程、关键技术及实施效果,为同类型桥梁提供参考。The Edong Highway Bridge over the Changjiang River with a 926 m main span is a hybrid girder cablestayed bridge with its side span being a concrete beam and midspan being a steel box girder. According to the structural characteris tics of the bridge, the effect on the bridge geometry and stress by closure conditions and different closure schemes is analyzed, and the construction scheme of loading closure is finally decided. This paper introduces the specific process, key technology and implementation effect of the closure process, providing references for same types of bridges.

关 键 词:鄂东长江公路大桥 混合主梁 加载合龙 

分 类 号:U445.46[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象