检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]东北电力大学电气工程学院,吉林吉林132012
出 处:《东北电力大学学报》2013年第1期20-26,共7页Journal of Northeast Electric Power University
摘 要:考虑不同约束条件(例如发电机黑启动能力,电能供需平衡和孤岛独立性),提出一种系统性算法,应用于电力系统大规模停电之后重建时的分区方法。在PMU最优配置基础上,实现不同约束条件(包括电力系统恢复的传统限制,还有WAMS操作中的现代监测限制)的复杂电力系统恢复分区,并可监测每个孤岛。基于新英格兰10机39节点算例系统进行电力系统PMU优化配置及分区恢复验证,结果表明,本文所提算法具有实用性和有效性。Based on a minimal PMU installed network, the sectionalizing process is designed in such a way that resulted islands satisfy a variety of constraints (including the classic constraints of power system restoration planning as well as modern observability constraint of WAMS operation). And each island will be fully observ- able. When solving minimal PMU installed network and separately restorable islands, the application of the pro- posed algorithm on the New England 39 bus power system with 10 generators implies that the proposed analytic algorithm is useful in power system restoration planning.
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145