不同厂坝连接型式下的厂房稳定性分析  

Stability Analysis of Powerhouse under Different Connection Style between Powerhouse and Dam

在线阅读下载全文

作  者:勾嘉[1] 李同春[1] 

机构地区:[1]河海大学水利水电学院,江苏南京210098

出  处:《水电能源科学》2013年第5期140-144,共5页Water Resources and Power

摘  要:针对某坝后式水电站厂坝连接问题,建立了包括厂坝、基岩及其软弱结构带在内的整体有限元模型,并在分缝处设置以接触力为未知量的接触单元,采用有限元混合法研究了在自重、水压力、地震作用及泄洪振动下,不同厂坝连接型式下厂房受力变形特征、厂坝整体抗滑稳定性及厂房泄洪振动响应特性。结果表明,厂坝平缝连接既能有效改善厂房的静动力响应状态(应力、位移、加速度等),又能提高厂房结构、机组正常稳定运行及厂坝整体抗滑稳定安全系数,具有一定的合理性和工程实际意义。Aiming at the connection problem of power station at dam toe, an integral finite element model including dam, powerhouse, bedrock and weak structure plane in bedrock was established. And this analysis model defined the parting elements as the contact elements based on an unknown contact force. This paper researched the stress and deform ation of powerhouse, the stability against sliding with different joins and the responses of vibration by flood discharge un- der gravity force, water pressure load, seismic load and discharge vibration. The results show that combination of dampowerhouse ameliorates the stress situation, the static and dynamic responses and the unit operation situation; it strengthens the stability against sliding as well, which has a certain rationality and engineering actual significance.

关 键 词:厂坝连接型式 有限元混合法 稳定 地震 泄洪振动 

分 类 号:TV731.11[水利工程—水利水电工程] TV311

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象