检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘琳[1] 杨长明[1] 姜德刚[1] 李建华[1]
机构地区:[1]同济大学长江水环境教育部重点实验室,上海200092
出 处:《环境工程学报》2013年第5期1651-1655,共5页Chinese Journal of Environmental Engineering
基 金:国家"水体污染控制与治理"科技重大专项(2011ZX07303-001)
摘 要:利用高速泳动床反应器作为预处理装置处理村镇微污染水体,出水进入组合人工湿地。结果表明,实验阶段高速泳动床在HRT为1.2 h时,尽管泳动床进水各污染物浓度较低,但反应器对COD、TN和TP仍具有较明显(P<0.05)的去除效果,平均去除率分别为11.3%、14.6%和25.8%。高速泳动床反应器对氨氮去除效果尤为明显,去除率达到46.9%。此外,高速泳动床反应器内硝化作用较强,出水中硝态氮含量平均增加率为45.5%,弥补了后续人工湿地硝化作用不强、除氨氮效果不佳的缺点。Biofringe bed was applied to pretreat eutrophic micro-polluted water in village before flow into a constructed wetland. The results indicated that during experimental period, biofringe bed had significant (P 〈 0.05) purification effects. The average removal rates of COD, TN and TP were 11.3% , 14.6% , and 25.8% , respectively. Especially, the biofringe bed showed excellent transformation efficiency of NH3-N with the removal rate of 46. 9%. In the BF reactor, nitrification process was relatively powerful, and NO3^- -N in outlet increased by 45.5% on average, as compared to that in input, which can compensate for weakness of low nitrification and NH3-N removal rate in constructed wetlands.
分 类 号:X522[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117