海上三边形测风塔桩基础设计探讨  

Foundation Design of an Offshore Triangular Anemometer Tower

在线阅读下载全文

作  者:李占岭[1] 王景廷[1] 赵怀宇[1] 王健飞[1] 

机构地区:[1]河北省电力勘测设计研究院,石家庄050031

出  处:《土工基础》2013年第2期54-57,62,共5页Soil Engineering and Foundation

摘  要:结合国电乐亭月坨岛海上3号测风塔的方案设计,对三边形测风塔桩基础的设计荷载及组合、有限元内力分析及桩基承台抗弯计算等内容进行了论述。经与四边形桩基础布置方案比较,三角形测风塔桩基础方案具有明显的经济优势。Based on the design plan of the National Electric's Yuetuo Island No. 3 offshore anemometer tower in Yueting County, this paper presents a case study of the design and analysis of the foundation of an offshore triangular anemometer tower. The load magnitude and combination aspects of this structure are discussed. The finite element analysis of the foundation components and the estimation of the bending moments in the pile-cap are also introduced. Compared with the quadrilateral pile foundation distribution, the triangular pile-cap option has the advantage in the construction cost.

关 键 词:三边形测风塔桩基础 设计荷载及组合 有限元分析 抗弯计算 经济比较 

分 类 号:TU473[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象