检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:浦吉丰
机构地区:[1]苏州市水利工程质量检测中心有限公司,江苏苏州215300
出 处:《土工基础》2013年第2期122-124,131,共4页Soil Engineering and Foundation
摘 要:随着沿海地区经济的快速发展,需要大量的建设用地。由于用地指标的限制,这些地区经常需要在海滩的软土地基上进行围海造地工程。类似工程的堤基土物理力学性质差,施工期和工后沉降量均较大,为控制围堤吹填加载速率,保证围堤施工期断面稳定,设计一般会要求进行施工期动态监测。With the rapid economic development of the eastern coastal provinces, large quantities of land are needed as constructions sites. Due to the limitations of the commercially available land, many engineering projects of near the sea tend to reclamation of the tidal marsh with soft soils with embankment encircled dredged materials. These embankments are usually mar ginally stable due to its poor soil properties. Large construction settlement and post construction settlement are expected. The construction monitoring is necessary in order to control the rate of dredge filling and the stability of the embankment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.226