黑岱沟煤矿综放开采提高回采率技术研究  被引量:2

Study on Technology to Improve Mining Rate of Fully Mechanized Top Coal Caving Mining Face in Heidaigou Mine

在线阅读下载全文

作  者:段红民[1] 李春阁[2] 

机构地区:[1]北京天地华泰采矿工程技术有限公司,北京100013 [2]新疆工程学院,新疆乌鲁木齐830091

出  处:《煤炭工程》2013年第5期65-67,共3页Coal Engineering

基  金:天地科技青年创新基金资助(TZ-JJ-10-HT-03)

摘  要:黑岱沟煤矿6号煤层采用分层综放开采工艺,资源回采率较低,文章通过对602工作面的资源损失构成分析,得到该矿综放开采主要资源损失发生在区段煤柱损失、两端头不放顶损失和放煤工艺损失等,并从推广无煤柱开采、提高工作面长度、降低初末采资源损失和减少采空区浮煤等方面对综放开采回采率提高技术进行了分析研究。A slicing fully mechanized top coal mining technology was applied to No. 6 seam in Heidaigou Mine and the mining rate of the coal resources was low. With an analysis on the resources lost composition of No. 602 coal mining face, the main resources lost occurred of the fully mechanized top coal caving mining were the sectional coal pillars lost, no top coal caving of the two face ends and top coal caving technology. An analysis study was conducted on the technology to improve the mining rate of the fully mechanized top coal caving mining from the promotion of the pillarless mining, the increasing of the mining face length, the reduction of the initial and terminal mining resources lost and the ground coal in the goaf.

关 键 词:综放开采 回采率 无煤柱开采 顶煤预裂 区段煤柱 

分 类 号:TD823[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象