检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]贵州高速公路开发总公司,贵州贵阳550000
出 处:《公路工程》2013年第2期51-54,共4页Highway Engineering
基 金:贵州省交通运输厅资助项目(2010-122-034)
摘 要:根据预应力锚索抗滑桩的结构受力特点,运用弹性地基梁法,抗滑桩与锚索的变形协调原理建立方程组。编写大量计算程序,快速计算出锚索拉力、桩身内力及位移。将计算结果与常用的设计计算方法进行比对,优化后的计算方法为工程建设节省了大量投资。自编的计算程序有利于推动此类方案的设计由粗放型向精细化、由单靠经验向更为科学的方向不断发展。该方法直观、方便、快捷且适用,有效控制投资,可为同类工程设计提供有益参考。According to the structure stress characteristics of anti-sliding with prestressed ancho- ring cable, Using the method of elastic foundation beam, equations were established basing on Anti-slide pile and anchor the principle of deformation coordination. A lot of calculation program was writed,which can quickly calculate anchor tension,the internal force and displacement of pile. By comparison the cal- culating results with the outcome of the common design calculation method, the optimal design method saved a lot of investment for project construction. Tthe calculation program is conducive that the design of this kind of scheme is driven by extensive model to intensive, from experience alone to a more scientific direction. This method is intuitive, convenient, fast andapplicable, control the investment effectively, provide a useful reference for similar engineering design.
分 类 号:U416.14[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229