检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交第二公路勘察设计研究院有限公司,湖北武汉430056 [2]广东核力工程勘察院,广东广州510800
出 处:《公路工程》2013年第2期159-161,185,共4页Highway Engineering
摘 要:由于前期勘察的疏漏,导致陶家沟特大桥3#墩台12根基桩分置于断层上下两盘,而暴雨引发的滑坡又使得该墩台位于断层上盘的部分基桩裸露,同时在墩台的南西侧由于滑移牵引效果使Ⅱ号滑坡体复活,对3#墩台的稳定性构成极大威胁。因此有必要对Ⅱ号滑坡体进行专题性勘察,评价其稳定性,为滑坡治理提供依据。due to the neglect of preliminary investigation, abutment 3 of Taojiagou super long bridge is set at an extremely unreasonable location. Storms led to landslide and got part of the abutment exposed outside while the movement and hauling effect of the southwest side of the abutment make the landslide Ⅱ reactive and subsequently it causes great threat to the stability of abutment 3. Therefore, it is necessary to conduct specific investigation on landslide Ⅱ, assess its stability and provide evidence for its treatment.
分 类 号:U416.163[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.244.218