检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马长乐 袁龙飞[2,3] 张羽 胡万胜 曹长江[2,3] 魏红磊[2,3]
机构地区:[1]山西潞安煤业集团余吾煤业公司,山西长治046100 [2]中国矿业大学矿业工程学院,江苏徐州221116 [3]煤炭资源与安全开采国家重点实验室,江苏徐州221116
出 处:《煤矿安全》2013年第5期98-100,共3页Safety in Coal Mines
摘 要:在高瓦斯条件下,巷道掘进的快慢将直接影响采掘工作面的正常接替。以余吾煤业掘进工作面为研究对象,通过对掘进工作面的现场观测分析,找到影响大断面煤巷快速掘进的影响因素,提出了改变顶板临时支护和优化掘进施工工艺等措施,同时利用工业工程现场管理知识对工序进行标准时间优化,提高了煤巷掘进速度。In the high gas conditions, the speed of excavation will directly attect me normal replacement of mining working race, tatting excavating working face of Yuwu Coal Company as research objection, affecting factors which directly affect the rapid excavation of large section seam roadway are found through analyzing the excavating working face, and improving methods which include replacing temporary support and optimizing the excavation construction technology and so on are also brought forwards. At same time, each process time is standardized by using theory of industrial engineering management to enhance excavation speed of the seam roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222