检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:韩超[1]
机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043
出 处:《铁道标准设计》2013年第6期118-122,共5页Railway Standard Design
摘 要:随着高速铁路客运专线和轨道交通引入,既有铁路综合客运站枢纽功能将发生重大变化,综合枢纽能否发挥出最高效率,其改扩建规划建设的研究尤为重要。从大型铁路综合客运枢纽站各种交通衔接、流线组织、换乘设计、客运枢纽的改建、新建等方面进行分析,提出大型铁路客运交通枢纽站改扩建规划技术路线和方法,通过铁路长春客运枢纽站改扩建的归纳总结,对国内类似大型铁路综合客运枢纽站改扩建规划建设有借鉴意义。With high-speed railway passenger-dedicated line and rail transit coming into being, the terminal function of the existing comprehensive railway passenger station will be changed significantly. Therefore, whether the comprehensive terminal gives its maximum efficiency or not largely depends on how its reconstruction and expansion planning have been researched. By analyzing relevant issues, such as the connection among various traffic modes, streamline organization, interchange design, reconstruction and new construction and so on, the author suggests the technical strategy and method for the reconstruction and expansion planning of large comprehensive railway passenger terminal station. Also, the author makes a summarization on the reconstruction and expansion project of Changchun Railway Passenger Terminal Station, which can serve as reference for the planning research of reconstruction and expansion project of similar large comprehensive railway passenger terminal station in our country.
关 键 词:铁路客运枢纽站 长春站 改扩建 交通换乘 交通组织
分 类 号:TU248.1[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143