检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:金英春[1]
机构地区:[1]新疆水利水电勘测设计研究院,新疆乌鲁木齐830091
出 处:《中国水能及电气化》2013年第5期56-60,共5页China Water Power & Electrification
摘 要:本文在叶尔羌河下游水电梯级开发河谷段地质勘察资料的基础上,根据地层岩性、地下水流场、地下水补径排、地下水动态条件,通过建立地下水数学模型,预测水电梯级开发实施后地表水量、地下水水位变化等方面情况,分析评价对河谷段生态环境的影响。In this paper, groundwater mathematical model is established on the basis of geological survey data of Yarkant River hydropower cascade development valley segment according to lithology, groundwater flow field, groundwater recharge, flow and discharge as well as groundwater dynamic conditions. Conditions in the aspects of surface water amount, groundwater level change and the like after hydropower cascade development and implementation are predicted. The influence on the valley segment ecological environment is analyzed and evaluated.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.26.35