检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陆建宇 王强 申建建[2] 程雄[2] 王嘉阳[2] 武新宇[2]
机构地区:[1]国家电网华东电力调控分中心,上海200002 [2]大连理工大学水电与水信息研究所,辽宁大连116024
出 处:《华东电力》2013年第5期931-937,共7页East China Electric Power
摘 要:针对华东电网直调多电源短期联合优化调度问题,建立了一种涉及多个电网的水火电调峰优化模型,并根据各类电源运行特点,分别设计了适合常规水电站、抽水蓄能电站及火电站的实用化模型求解方法,以确定直调电站的日出力过程;同时给出了一种适用所有电站的出力网间分配方法,以合理安排电站送往多个电网的出力过程。参考华东电网直调电厂实际运行情况,给出了模型和求解方法的验证实例。This paper constructs a hydro-thermal power peak load regulation model for multiple grids with a view to the direct dispatching optimization for East China grid with multi-power short-term joint. Then based on the operational features of multi-type powers, it formulates the practical model solving methods adaptable to conventional hydropower station, pumped storage power station and thermal power station, so that the daily output process of the direct dispatc- hing station can be defined. Meanwhile, an output distribution method among power grids is proposed fit for all sta- tions, in order to schedule the output process of stations to distribute power to multiple grids. With the reference to East China direct-dispatching power plants, case study was conducted to verify the model and solution.
分 类 号:TM711.2[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.142.244.250