煤矿井下巷旁充填早强混凝土沿空留巷技术  被引量:20

Technology of Gateway Retained Along Goaf with Quick Setting Concrete Backfilled at Gateway Sidewall in Underground Mine

在线阅读下载全文

作  者:贾民[1] 马纪安[1] 

机构地区:[1]兖州煤业股份有限公司济宁二号煤矿,山东济宁272072

出  处:《煤炭科学技术》2013年第5期58-62,共5页Coal Science and Technology

摘  要:针对济宁二号煤矿深部中厚煤层综采工作面地质条件复杂、开采深度大、工作面搬家频繁、采掘接续紧张、工作面孤岛开采等问题,研究了沿空留巷顶板运动规律,采用以巷旁充填早强混凝土为主体的沿空留巷技术,对沿空留巷巷旁混凝土墙受力与变形进行了数值模拟分析,并对巷旁支护参数和顶板锚固加强支护进行了设计。在93上02工作面运输巷中采用该技术沿空留巷870 m,混凝土墙墙体稳定;93上03工作面轨道巷沿空留巷后,矿压观测结果表明沿空留巷变形小于煤柱护巷,经济效益显著。According to the complicated geological conditions, deep mining depth, frequent coal mining face removing, high tension replacement of coal mining face and excavation face, mining in island seam face and other problems of a fully mechanized coal mining face in the deep section of Jining No.2 Mine,the paper studied the roof movement law of the gateway retained along goaf.The gateway retained along goaf technology mainly with quick setting concrete backfilled at the gateway side was applied.A numerical simulation analysis was conducted on the stress and deformation of the concrete wall at the side of the gateway retained along goaf.A design was conducted on the support parameters of the gateway side and the anchor reinforced support of the roof. In the transporation gateway of No.93A02 mining face, the technology was applied to the gateway retained along the goal with a length of 870 m and the concrete wall was stable.After the rail gateway of No.93A03 mining face gateway retained along goaf,the mine strata pressure observation results showed that the deformation of the gateway retained along the goaf was less than the coal pillar protected gateway and the economic benefits were obvious.

关 键 词:泵送早强混凝土 沿空留巷 巷旁支护 顶板控制 矿压观测 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象