检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱红青[1] 李峰[1] 张悦[1] 高如乐[1] 潘凤龙[1]
机构地区:[1]中国矿业大学(北京)资源与安全工程学院,北京100083
出 处:《煤炭科学技术》2013年第5期72-75,78,共5页Coal Science and Technology
摘 要:为解决常村煤矿工作面巷道采用"两进两回"设计,煤损失量大,瓦斯抽采效率低问题,利用FLAC3D模拟回采过程中上覆岩层破坏规律,确定了距3号煤层顶板31 m处的K8岩层为关键层,采用UDEC模拟回采过程中上覆岩层裂隙发育及分布规律,得到工作面走向方向裂隙发育区域为距开切眼后方5~48 m;竖直方向裂隙发育区域垂高距煤层顶板21~31 m;开切眼上方采空区断裂带宽度约为40 m,工作面上方断裂带宽度约为48 m;巷帮两侧裂隙发育区域宽度略小于40 m。根据现场对2103工作面邻近S-39工作面裂隙带测试结果,表明上覆岩层裂隙发育带位于煤层顶板36m范围内,与数值模拟结果比较吻合。根据数值模拟与现场测试结果,设计了2103工作面高位瓦斯抽采巷参数:水平层位距回风巷30~45 m,竖直层位距煤层顶板约27m。A design with two air income and two air returning was applied to the gateways of coal mining face in Changcun Mine, the coal lost was high and the gas drainage efficiency was low.The FLAC3D software was applied to simulate the failure law of the overburden strata during the coal mining process.K8 stratum with a distance of 31 m above the roof of No.3 seam was determined as a key stratum.The UDEC software was applied to simulate the crack development and distribution law of the overburden strata during the coal mining process and the crack development zone along strike direction of the coal mining face was at 5 -48 m beyond the open-off cut.The vertical crack develop- ment zone was at 21- 31 m vertically above the seam roof.The width of the breaking zone in the goaf above the open-off cut was about 40 m and width of the fractured zone above coal mining face was about 48 m.The width of the crack development zone at the two side of the gateway sidewalls was less than 40 m.According to the measured results of the crack zone in a neighboring coal mining face S-39 of No. 2103 coal mining face.The numerical simulation results was consistent with the test results that overlying strata fissure development zone lo- cates in the 36 m range of roof.According to the results of numerical simulation and test results ,the parameters of high level gas drainage gateway was designed that the distance between horizontal layer and air return way was 30 - 45 m, the distance between vertical horizon and coal seam roof was 27 m.
分 类 号:TD712[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28