国际BOT发电项目前期投资控制分析  

On investment control in preliminary stage of international BOT power projects

在线阅读下载全文

作  者:罗明清 吴泽斌[2] 

机构地区:[1]中水电海外投资有限公司,北京100048 [2]水利部办公厅,北京100053

出  处:《水利经济》2013年第3期30-32,74,共3页Journal of Economics of Water Resources

摘  要:针对国际BOT发电项目工程周期长、资金投入大、资金回收期长、风险高的特点,分析我国BOT发电项目中应注意的问题,提出在项目前期加强投资控制的具体措施:通过设置合理的电价机制,锁定投资项目收益,控制设计方案、承包成本以及设置合理的融资成本以锁定项目成本。In view of the characteristics of international BOT power projects such as long period,huge investment,long recovery period and high risk,the problems in China' s BOT power projects which should be highlighted are analyzed.Some measures for strengthening the investment control in the preliminary stage of the projects are put forward: to ensure project benefit by working out reasonable electricity price mechanism and to lock project cost by controlling design schemes,contracting cost and financing cost.The results may be reference for the investment control of international BOT power projects.

关 键 词:国际BOT项目 发电项目 投资控制 

分 类 号:F407.2[经济管理—产业经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象