检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林洁[1,2] 王瑞锋[1,2] 邵盛伟[1,2] 孙超[1,2]
机构地区:[1]浙江省水利河口研究院,浙江杭州310020 [2]浙江省河口海岸重点实验室,浙江杭州310020
出 处:《浙江水利科技》2013年第3期38-40,共3页Zhejiang Hydrotechnics
摘 要:采用定床和动床水流泥沙整体物理模型研究了飞云江河口区水中塔基建造对所在河段的水动力和河床冲淤的变化,分析了塔基建造对河道防洪排涝、航道安全、飞云江三桥、北岸深槽的影响,对一定距离外的桥梁、航道和堤塘的不利影响较小,但塔基附近会产生4.00m左右的局部冲刷。With integral physical model testing of immovable & movable bed about current and sediment, this paper studies hydrodynamic and scouring - silting variations of the river section where the column foot is built, and analyses the impact of the column foot on flood control & drainage, waterway security, Third Bridge of Feiyun River and north deep channel. Results show that adverse impact is minor on bridge, waterway and seawalls at a certain distance from the column foot, except 4-meter local scouring near the column foot.
分 类 号:TV131.6[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.95