作 者:陈国峰[1] 宋洪运[1] 邓先友[1] 常开忠[1]
机构地区:[1]中国南方电网超高压输电公司安宁局,云南昆明650217
出 处:《贵州电力技术》2013年第5期69-71,87,共4页Guizhou Electric Power Technology
摘 要:楚雄换流站开始孤岛调试第四阶段补充实验,当操作到试验项目1的联网转孤岛(16.20_S12)中的第12步:将极Ⅰ高端换流变分接头控制模式由定角度模式改为Udi0模式后极Ⅰ低端阀厅F5避雷器动作,导致的极Ⅰ双阀组闭锁。此次闭锁主要是由于极Ⅰ低端阀厅F5避雷器故障引起的,在以往高压直流输电工程中较为少见,文章将故障分析、处理过程作了总结。The decoupled (island) mode debugging test of Chuxiong Converter Station was began stage 4 - additional test, "networking -mode turn to decoupled -mode test" Step 12 (16.20_S12) : pole -I tapped control mode turned fixed -mode to Udi0 mode, pole - I low valve hall F5 arrester malfunction, then pole - I lock. The lock was mainly caused by the pole - 1 low valve hall F5 arrester fault, and it was rare in high -voltage direct current transmission project in the past. So the paper summarized the fault analysis and treating processes.
分 类 号:TM8[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222