检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:纪传佳
机构地区:[1]中海炼化有限责任公司惠州炼化分公司,广东惠州516086
出 处:《广州化工》2013年第10期199-201,共3页GuangZhou Chemical Industry
摘 要:连续重整装置预加氢系统2009年4月份开工后存在原料性质与设计相差大,只能维持70%~80%的负荷操作;铵盐结晶导致进料/产物换热器管程堵塞,反应系统压降增大的问题。本文分析了各类问题的原因,并采取了增大预加氢注水量;经常切换注水点;强化原料管理;降低预加氢处理量等措施;最后提出了增上预加氢脱氯反应器、扩大汽提塔顶含硫C5直径、更换汽提塔回流泵的三个技术改造措施。There were some problems of the pre - hydrotreating system in Continuous Catalytic Reformer Unit after it started in April 2009. Such as the raw feed was different from that of the design. The exchanger of the feed/production was blocked by the ammonium salt generated in the hydrotreating reaction and the pressure drop of the pre - hydrotreating system increased gradually. The reasons of the above pre -hydrotreating system's problems were analyzed and some methods of increasing the flow of the pre - hydrotreating wash water, changing the injection point frequently, controlling the quality of the raw feed, and deceasing the flow of the raw feed were proposed. Three transformation technological countermeasures of adding a hydro - dechlorine reactor, expanding the sulfur C5 line on the top of the stripper and changing the reflux pump were put forward.
分 类 号:TE6[石油与天然气工程—油气加工工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15