检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏宁沪高速公路股份有限公司,江苏南京210049
出 处:《现代交通技术》2013年第2期29-31,48,共4页Modern Transportation Technology
摘 要:针对先张法预应力空心板梁底板纵向裂缝病害往往在使用阶段才出现这一现象,提出纵向裂缝形成与使用阶段活载作用有重要联系;通过对使用阶段车辆荷载作用下板梁的横向应力情况进行计算,并以桥梁宽跨比、板梁底板厚度为可变参数,分析活载作用下纵向裂缝形成的规律;探讨得出使用阶段板梁底板纵向裂缝形成的原因,提出针对性处治措施。Considering that longitudinal cracks on the floor of pre-tensioned prestressed hollow slabs are usually occurred in service stage, the live load which should be a quite important factor is proposed. Based on the calculation of transverse stress on the floor in service stage, the forming process of longitudinal cracks is analyzed, while the width-span ratio and the thick- ness of the floor are both considered as variable parameters. Then the causes of longitudinal cracks are discussed and demonstrated, and several treatments are proposed.
分 类 号:U445.71[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.217.13.162