检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南工程学院建筑工程学院,湖南湘潭411104 [2]中南大学土木工程学院,湖南长沙410004
出 处:《华东经济管理》2013年第6期98-100,共3页East China Economic Management
摘 要:文章基于资本资产定价模型分析了政府最低收益保证对私人投资基础设施项目的债务成本、权益成本、预计权益收益率和净现值等财务指标的影响,并进行了风险评价和算例分析。研究表明,最低收益保证可以降低债务成本,还可通过杠杆作用增加或减少权益成本,并能提高NPV和预计权益收益率,使得原本不可行的基础设施项目得以实施。The paper discusses the influence of government minimum revenue guarantee on cost of debt, cost of equity, expected return on equity and net present value of private infrastructure projects. And then risk assessment and example analysis are brought up. The resuhs show that the presence of a guarantee reduces the cost of debt, promotes or reduces the cost of eq- uity through leverage level and promotes the expected return on equity and net present value. Thus the infeasible infrastructure project could be implemented favorably. Definite evaluation index formula and risk analysis in this article can help provide decision reference for government departments and private investors.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.142.219.125