检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团华东勘测设计研究院,浙江杭州310014
出 处:《大坝与安全》2013年第2期1-3,共3页Dam & Safety
摘 要:江边水电站拦河坝基础覆盖层深厚,最大深度约110m。基础覆盖层分层明显,床质多为第四系冲洪积、冲湖积、崩坡积地层,属中等-强透水层,各层的渗透性差异较大,渗透稳定性较差。为确保防渗结构安全、可靠、经济合理,在对覆盖层的渗透特性进行研究的基础上,拟定了多个处理方案进行比选,最终选择了防渗墙插入砂质粉土层5m的方案。The dam foundation of Jiangbian hydropower station is composed of deep riverbed overbur- den. Its maximum depth is about 110 m. The layers of the overburden are obvious. The materials are mostly Quaternary alluvial-diluvial and colluvium formation. They are highly permeable. Permeability of the layers are quite different and their penetration are n. ot stable. In order to ensure the seepage con- trol structure safe, reliable and economical, based on study of the permeability of the covering layer, sev- eral treatment options for selection have been developed. By comparison, a cut-off wall 5-m deep into the sandy silt layer is adopted.
分 类 号:TV543.8[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.213