检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:柯国土[1] 许汉铭[1] 袁履正[1] 李小华[1]
机构地区:[1]中国原子能科学研究院反应堆工程设计研究所,北京102413
出 处:《原子能科学技术》2000年第2期97-104,共8页Atomic Energy Science and Technology
摘 要:基于传统PSA方法学 (适用于功率运行工况 )及核电站停堆工况特征 ,提出了一套停堆PSA特征方法 ,包括电站运行状态离散法 ,分阶段评价法和主逻辑故障树评价。将该方法应用于大亚湾核电站 (GNPP)停堆工况PSA研究 ,得到了较真实反映GNPP实际情况的结果。研究结果对GNPP的停堆运行和管理有实际应用价值 ,对我国今后核电站设计。Based upon traditional PSA methodology used in full power condition and the features of NPPs (nuclear power plants) at shutdown operation, a specific approach to conduct shutdown PSA practically and feasibly is proposed. This Approach includes mainly discretization of POSs (plant operation states), phased evaluation and master plant logical fault tree. This feature approach is applied in shutdown PSA for GNPP, and some results and suggestions, which reflect the realistic situation of GNPP, are obtained. These recommendations and conclusions are of practical value to shutdown operation at GNPP and they are also of great significance for design, operation and management for other domestic NPPs.
分 类 号:TL364.1[核科学技术—核技术及应用] TM623.8[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117