出 处:《施工技术》2013年第10期6-9,26,共5页Construction Technology
基 金:中建电力建设有限公司科技研发课题:第三代核电站(EPR)技术研发和创新(CSCEC-2008-Z-17)
摘 要:结合台山核电站汽轮机基座工程,提出了高支模施工、弹簧隔振器安装、汽轮机平台大模板施工、大型高精度埋件安装、温度与裂缝控制过程中的主要施工技术难点,介绍了一系列先进施工技术,如高支模满堂承重脚手架,弹簧隔振器施工技术,汽机平台大模板施工技术,高精度埋件施工技术,混凝土温度控制及搭设养护棚综合养护施工技术,使施工质量得到保证。Combined with the turbine pedestal project of Taishan Nuclear Power Station,the main construction difficulties during high-formwork construction,spring vibration isolator installation,large-formwork construction for the turbine floor,installation of large-scale embedded parts with high precision and the control of temperature and crack are put forward.A series of advanced construction technologies are introduced,such as construction of full scaffold for high-formwork,construction of spring vibration isolator,construction of large-formwork for the turbine floor,construction of embedded parts with high precision,control of concrete temperature and concrete maintenance with maintenance shed,etc.The application of these measures ensured the construction quality.
分 类 号:TU271.5[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249